The future is Hybrid

We understand that customers have different energy and power needs, thus the PSW Group hybrid battery system is designed to enhance the overall operation of your rig or vessel. The system ensures reduced maintenance costs and fuel savings, as well as substantial emission reductions. The hybrid battery is integrated with conventional diesel engines, and offers significant efficiency improvement by running the engines on optimal load and absorbing many of the load fluctuations through batteries.

By increasing the power redundancy, the system allows the engine to operate with the highest efficiency and lowest emissions, which will result in reduced maintenance need and increased system performance. The PSW Group hybrid/battery system is suitable for new projects, as well as retrofits of existing installations.

Applications

  • Spinning Reserve
  • Electric and Hybrid Propulsion systems
  • Power back-up
  • Peak-Shave

Benefits

  • Adapt to industry and operator requirements
  • Investment incentives from Enova / NOx fund
  • Optimized engine operation
  • Fuel saving and reduced emissions–Nox, CO2 and Sox  (Yearly fuel savings between 10-20%)
  • Increased redundancy and efficient operations
  • Reduced maintenance costs
  • Increased performance
  • Reduced OPEX by lower fuel consumption
  • Safer operation
  • Faster dynamic response
  • Retrofit. Existing rigs may replace diesel generator sets with battery technology.
  • Cranes. Stored battery energy supplies peak load conditions, braking energy can be used to charge the battery source
  • Energy Storage using batteries supports running of the diesel engines at optimum specific fuel consumption
See our products
For any questions, please ask for
Ole-Ivar Guleng
Want to send us a message?

Open requestform

Please fill in required info

References

CAPPING STACK

PSW Group offer a Capping Stack & related services and equipment as part of the Norwegian Oil & Gas emergency response plan. The capping stack is stored at PSW Group's facilities at Mongstad and can be ready at quayside within 24 hours of notification.

Read more
ISO.png
Achilles-01.png
nemko presafe.png